Portable light sources have been one of the most evolving inventions in history -- from the primitive torches and oil lamps of yesteryear, to today's battery-powered flashlights and headlamps. But through it all, most of these illuminating tools have required an outside energy source that would deplete when needed the most. But now, thanks to one particularly enlightened 15-year-old girl from Canada, your next flashlight just might be powered by the heat from your hand.
At the tender age of 15, Canadian high school student Ann Makosinski has designed and built a flashlight powered by body heat.
Her Hollow Flashlight secured her a finalist slot in the 15-16 age group of the Google Science Fair ahead of thousands of entries from more than 100 countries.
The LED flashlight relies on the thermoelectric effect, with tiles that generate electricity from the differences in temperature to generate electricity.
The tiles are fixed to the outside of a hollow tube so that when held, one side of the tile is heated by the warmth of the hand, while air flowing through the hollow tube helps keep the other side cool. The electricity generated by the temperature differential between either side of the tile powers the LED light.
Makosinski built two different flashlights. The first was made using a tube of aluminum, which is a good heat sink material thanks to its high thermal conductivity, while the second was built using a PVC tube.
Both models work better when the difference between the ambient temperature and body temperature is greater. So while the flashlights worked with an air temperature of 75°F, they emitted more light with the air temperature at 60°F. Both flashlights were able to maintain a steady beam of light for 20 minutes, even in the warmer temperature.
The final cost of each flashlight came to only $25, but if mass-produced, the cost would be substantially lower.
Tuesday, October 1, 2013
Thursday, September 19, 2013
World’s First Invisible Skyscraper to Be Built in South Korea
Designed by architectural firm GDS Architects, Tower Infinity in South Korea will be the world’s first ‘invisible’ skyscraper. Equipped with an LED facade system with optical cameras, the building will create a reflective skin to display the background behind it on its exterior—allowing it to blend in with the skyline. Developers of Tower Infinity were recently granted construction permits to begin building the skyscraper on the outskirts of Seoul, near the city’s airport.
At a height of 1,467-feet, the building will be used for entertainment and leisure purposes, and will include a 4D Theater, restaurants, a water park, landscaped gardens, and the third-highest observation deck in the world.
“Instead of symbolizing prominence as another of the world’s tallest and best towers, our solution aims to provide the World’s first invisible tower, showcasing innovative Korean technology while encouraging a more Global narrative in the process,” said the company.
Check out the photos for a sneak preview at the world’s first ‘invisible’ skyscraper:


At a height of 1,467-feet, the building will be used for entertainment and leisure purposes, and will include a 4D Theater, restaurants, a water park, landscaped gardens, and the third-highest observation deck in the world.
“Instead of symbolizing prominence as another of the world’s tallest and best towers, our solution aims to provide the World’s first invisible tower, showcasing innovative Korean technology while encouraging a more Global narrative in the process,” said the company.
Check out the photos for a sneak preview at the world’s first ‘invisible’ skyscraper:


Wednesday, September 18, 2013
What the New York City Skyline Will Look Like In 2020
If current building proposals are any indication, New York's skyline is going to keep getting taller and taller. In the next few years, the skyline will boast 10 new towers. The 1,250-foot Empire State Building, currently the tallest completed skyscraper in the city, will rank third behind 1 World Trade Center and 432 Park Avenue. For an idea of what the city will look like a few years from now, check out renderings of the city that incorporate current construction projects.
Midtown, looking south towards downtown Manhattan:
The Far West Side will look a bit different once Hudson Yards is added:
Monday, September 16, 2013
Lighting Science Group Receives $20 Million Investment
Lighting Science Group Corp. recently announced it closed a $20 million preferred stock financing plan led by affiliates of Pegasus Capital Advisors, L.P., with participation from Riverwood Capital Partners, L.P. These companies are LSCG's two largest shareholders. Lighting Science Group received $17.4 million of the funds at the closing of the financing and has received a commitment to fund the balance of $2.6 million. The funding will be used to finance the company's growth, with a strong focus on technology platforms and product innovations.
![]() |
| Click to visit website |
Tuesday, September 10, 2013
NJ Gov to Back $1B PATH Train Extension to Newark Airport
New Jersey Governor Chris Christie plans to endorse a $1 billion extension of PATH service to Newark Liberty International Airport, according to several sources familiar with the governor's plan. The approval of extending PATH service to Newark Liberty International Airport would mean the money is almost certain to be allocated in the Port Authority's upcoming capital plan. It is not yet clear when Mr. Christie will publicly announce his support for the project.
Governor Christie's backing would almost certainly assure that the extension project, which has been mulled over by transit officials for more than a year, would be included in the Port Authority of New York and New Jersey's roughly $30 billion capital plan, which is expected to be released to the public in the coming months.
The extension would be of special benefit to lower Manhattan PATH riders, who would be able to take direct service from the World Trade Center complex all the way to Newark Airport and transfer to the Air Train to travel to the airport's terminals.
The extension also would offer airport riders a more direct service to Newark-Penn Station on the NEC, a major transfer point to New Jersey Transit rail, light rail, and bus services.
Downtown PATH service currently ends at Newark Penn Station, and the most common approach for riders coming from Manhattan now is to take New Jersey Transit from Penn Station in Manhattan to the Air Train, a route that requires downtown riders to first head to midtown.
Air Train Newark, the three-mile monorail line, opened in 1996 and was extended to the Northeast Corridor in 2000 with the opening of Newark Airport/Rail Station. The station is served by Amtrak and New Jersey Transit.
Airport advocates hailed the decision.
"A one-seat PATH ride from lower Manhattan directly to Newark Airport Air Train is a major step forward," said Joseph Sitt, founder of the Global Gateway Alliance to encourage improvements in the New York City-area airports.
Advocates note those working on airport grounds would also benefit from the improved access to airport terminals.
They also note that PATH's passenger capacity far exceeds that of connecting monorail service, setting up a potential passenger bottleneck for those transferring at Newark Airport/Rail Station.
The project would generate more than $1 billion in design and construction work while adding permanent jobs for the link's operation. The Port Authority has yet to release a start or estimated completion date for the project.
Governor Christie's backing would almost certainly assure that the extension project, which has been mulled over by transit officials for more than a year, would be included in the Port Authority of New York and New Jersey's roughly $30 billion capital plan, which is expected to be released to the public in the coming months.
The extension would be of special benefit to lower Manhattan PATH riders, who would be able to take direct service from the World Trade Center complex all the way to Newark Airport and transfer to the Air Train to travel to the airport's terminals.
The extension also would offer airport riders a more direct service to Newark-Penn Station on the NEC, a major transfer point to New Jersey Transit rail, light rail, and bus services.
Downtown PATH service currently ends at Newark Penn Station, and the most common approach for riders coming from Manhattan now is to take New Jersey Transit from Penn Station in Manhattan to the Air Train, a route that requires downtown riders to first head to midtown.
Air Train Newark, the three-mile monorail line, opened in 1996 and was extended to the Northeast Corridor in 2000 with the opening of Newark Airport/Rail Station. The station is served by Amtrak and New Jersey Transit.
Airport advocates hailed the decision."A one-seat PATH ride from lower Manhattan directly to Newark Airport Air Train is a major step forward," said Joseph Sitt, founder of the Global Gateway Alliance to encourage improvements in the New York City-area airports.
Advocates note those working on airport grounds would also benefit from the improved access to airport terminals.
They also note that PATH's passenger capacity far exceeds that of connecting monorail service, setting up a potential passenger bottleneck for those transferring at Newark Airport/Rail Station.
The project would generate more than $1 billion in design and construction work while adding permanent jobs for the link's operation. The Port Authority has yet to release a start or estimated completion date for the project.
Tuesday, September 3, 2013
Robots on Jobsites? Not So Far Fetched
MIT research scientists insist that the future of home building lies in technology which includes smart machines that can perform construction functions. A professor at USC has invented a fabrication process that operates on the principles of 3D printing. Software able to read blueprints guides a large mechanical arm suspended from a mobile scaffold. The arm extrudes liquefied concrete in patterns that form exterior and interior walls into any shape and height. Electrical, plumbing, flooring, and other finish work can be installed during the process, which operates nonstop until the structure is completed.
In the not so distant future, more and more activities will be operated by software. Instead of Teamsters, there will be robotic trucks. Where there had once been miners, there will be mining robots. Instead of factories, there will be 3D printers in your home.
But, robots on jobsites?
"Yes," says Dr. Khoshnevis, an engineering professor at the University of Southern California, who is betting on home building becoming part of that continuum.
Since 2002, he has been perfecting "Contour Crafting,” a fabrication process that operates on the principles of 3D printing.
Details like cutting window and door openings still are being refined. Khoshnevis has been soliciting investment capital for a startup company to sell the technology. He sees Contour Crafting as being suited for constructing affordable housing in areas where supply is short or where houses have been destroyed by natural disasters. He predicts the technology would reduce jobsite injuries, leave a smaller carbon footprint, and be cost-competitive with stick-built or modular construction after equipment and cycle times are amortized.
His invention might have residual benefits, too. Khoshnevis is working with NASA on a robotic system that could build structures on the moon and Mars using indigenous raw materials such as volcanic sand, which is common on the moon. That’s gotten the state of Hawaii—where volcanic sand abounds—interested in the process for producing cement.
How many years away do you think this technology is to being on jobsites?
In the not so distant future, more and more activities will be operated by software. Instead of Teamsters, there will be robotic trucks. Where there had once been miners, there will be mining robots. Instead of factories, there will be 3D printers in your home.
But, robots on jobsites?
"Yes," says Dr. Khoshnevis, an engineering professor at the University of Southern California, who is betting on home building becoming part of that continuum.
Since 2002, he has been perfecting "Contour Crafting,” a fabrication process that operates on the principles of 3D printing.
Details like cutting window and door openings still are being refined. Khoshnevis has been soliciting investment capital for a startup company to sell the technology. He sees Contour Crafting as being suited for constructing affordable housing in areas where supply is short or where houses have been destroyed by natural disasters. He predicts the technology would reduce jobsite injuries, leave a smaller carbon footprint, and be cost-competitive with stick-built or modular construction after equipment and cycle times are amortized.
His invention might have residual benefits, too. Khoshnevis is working with NASA on a robotic system that could build structures on the moon and Mars using indigenous raw materials such as volcanic sand, which is common on the moon. That’s gotten the state of Hawaii—where volcanic sand abounds—interested in the process for producing cement.
How many years away do you think this technology is to being on jobsites?
Friday, August 2, 2013
Stacks on Stacks: Apt Building Rises in 19 Days
Prefab construction has made a spectacular entrance in New York City. Nineteen days. That is all the time it took to put up a 28-unit, seven-story apartment building in the Inwood section of Manhattan this summer. This summer, prefab is yielding its first real fruits. The secret? Modular construction. The Stack, a 38,000-square-foot project comprised of 56 modules, was constructed on a 50x150 foot lot at Broadway and Academy Street, and is one of more than 17 modular projects underway in the city.
Working Monday through Friday from June 20 to July 18, a crew of just eight iron workers, a crane operator, and half-a-dozen helpers installed the 56 modules that make up the apartment building at 4857 Broadway.
Each 12-foot-wide prefabricated box was easily guided by the workers with a slight push, as it was suspended from a crane.
In a bow to the property's innovative construction technique, the building is to be known as The Stack. It was created by a partnership of developer/builder Jeffrey M. Brown Associates and Gluck+ architects.
Despite the touted economy of off-site, prefabricated housing, the methodology has made limited inroads in New York, stunted for decades by bureaucracy and a public that preferred flashy condominium projects.
Recently, interest in modular construction is catching on in a big way. That interest grew more urgent after Hurricane Sandy devastated parts of the city, leading officials to re-examine prefab disaster-housing schemes.
Part of modular construction's appeal of is that by building in a factory, the modules—as well as carpenters, plumbers, electricians and others building them—are protected from the elements, which helps ensure quality control and quicker construction. Door bells, lights, switches, bathrooms, tiles, kitchens, everything's in there already - even the first coat of paint.
And when it comes time to put the pieces together, a building can blossom in just a few weeks.
In the case of The Stack, it only took a few months to prepare the site and lay the foundations, and all the while crews were busy building the modules at a factory in Pennsylvania. The small modules do mean low ceilings, however—necessary, in part, to make it across the bridge to the city.
Working Monday through Friday from June 20 to July 18, a crew of just eight iron workers, a crane operator, and half-a-dozen helpers installed the 56 modules that make up the apartment building at 4857 Broadway.
Each 12-foot-wide prefabricated box was easily guided by the workers with a slight push, as it was suspended from a crane.
In a bow to the property's innovative construction technique, the building is to be known as The Stack. It was created by a partnership of developer/builder Jeffrey M. Brown Associates and Gluck+ architects.
Despite the touted economy of off-site, prefabricated housing, the methodology has made limited inroads in New York, stunted for decades by bureaucracy and a public that preferred flashy condominium projects.
Recently, interest in modular construction is catching on in a big way. That interest grew more urgent after Hurricane Sandy devastated parts of the city, leading officials to re-examine prefab disaster-housing schemes.
Part of modular construction's appeal of is that by building in a factory, the modules—as well as carpenters, plumbers, electricians and others building them—are protected from the elements, which helps ensure quality control and quicker construction. Door bells, lights, switches, bathrooms, tiles, kitchens, everything's in there already - even the first coat of paint.
And when it comes time to put the pieces together, a building can blossom in just a few weeks.
In the case of The Stack, it only took a few months to prepare the site and lay the foundations, and all the while crews were busy building the modules at a factory in Pennsylvania. The small modules do mean low ceilings, however—necessary, in part, to make it across the bridge to the city.
Watch slideshow below
Subscribe to:
Posts (Atom)












