Tuesday, July 12, 2016

Three Construction Projects Will Transform Temple University

Temple University is investing $300 million in new and upgraded facilities as part of a campus renaissance. Temple’s residential campus continues to evolve, with major construction projects bringing a new state-of-the-art library, a 35,000-seat football stadium, a health and wellness center and on-campus retail space. 

A new state-of-the art library 

The former site of Barton Hall will soon be home to Temple University’s new library, designed by Snøhetta, an architectural firm known for its innovative library designs, in partnership with Philadelphia-based design firm Stantec.

Demolition of the old Barton Hall was completed in March.

Plans include a library with more than 225,000-square-foot occupying a space approximately the size of a city block.

It will be bounded by Polett Walk to the south, Liacouras Walk to the west, Norris Street to the north and the Quad to the east.

A state-of-the art automated storage and retrieval system will allow the library to devote more square footage to learning spaces and less space to book stacks.
The new building will have dramatic arched entrances and a green roof, as well as a large, upper-level outdoor balcony space that will offer views of campus.

New Football Stadium

Temple University plans to construct a new 35,000-seat football stadium, with an estimated cost of $126 million, on the northwest corner of its main campus.

The multi-purpose stadium and retail complex will be bounded by Broad Street, Norris Street, 16th Street and Montgomery Avenue.

Temple has hired AECOM and architects Moody Nolan to design the project.

AECOM designed Florida Atlantic University's football stadium in 2012. At 29,419 seats, it's slightly smaller than Temple's stadium.

There are many reasons why the university is considering an on-campus stadium, including the long-term benefit of owning a stadium instead of renting one.

Owning a stadium is anticipated to result in net savings of approximately $3 million annually. That’s money that can be used for other priorities. The Philadelphia Eagles have been criticized for charging Temple $1 million a year to lease their stadium.

“Having our own stadium will help showcase our vibrant campus as we celebrate Temple’s accomplishments on and off the field," says Temple President Neil D. Theobald.

Temple Stadium will have a capacity of about 35,000—about half the size of Lincoln Financial Field, where the university now plays its home games.

The project promises to help revitalize North Broad Street and contribute to the North Philadelphia economy.

Construction will also include an adjacent practice facility and a student recreation building. Temple plans to begin construction of the facility in 2017.


Student Health and Wellness Center

Temple University will break ground this month on a new Student Health and Wellness Center—an academic, athletics and recreation facility that will provide space for students in the College of Public Health to hone their clinical skills along with space for recreational sports and weight training.

The centerpiece of the 95,000 square foot facility is the main entrance, angled toward the intersection of 15th Street and Montgomery Avenue.

A two-and-a-half-story glass atrium will greet pedestrians, who will enter the facility beneath a portion of an outdoor track that serves as a balcony above the main doors before returning to ground level around the perimeter of the building.

The multipurpose facility's academic area will have smart classrooms, laboratory spaces with the latest technology and lecture halls, as well as a unique apartment space where demonstrations can take place.

The new center will also have an indoor recreation area that includes a 70-yard synthetic turf field, a climbing wall and a juice bar.

The field is for use by the school's athletic teams, as well as participants in Temple's 36 club sports and 10 intramural sports. The recreation area will also offer twice the amount of free-weight space currently available to students. Outside, a track will be available to the public.

The targeted completion date is fall 2017. The architecture firm Moody Nolan designed the facility.